Repair concrete walls | 4bud.com.ua - All for repair of flats
can be performed in different ways. First - dry plaster. Wall letters are processed on dry plaster tork frame label or directly on the wall. The second method tork - wet plaster. On the wall is applied to the solution and held facing tile materials.
Fixing a flat, on a concrete surface make hand or machine, strokes notch. Strokes applied every 50 cm to a depth of 3 to 5 mm. If the surface is smooth, then there is no need to put a notch. Such walls are not plastered and leveled with a spatula. Also includes preparation of the concrete surface cleansing of dirt, dust, oily stains, concrete frame sag and stains.
If the walls are too big swings surface, then use a metal grid alignment. tork It is fastened with great tension, tork Entangling wire. To a flat surface plaster mesh can prymorozyty special solution or shoot stroypistoletom. Mesh plaster should not sag. After its attachment to apply cement milk.
1 Check the vertical walls. 2 Wetting water surface if applied to wet plaster. And - wipe with a damp cloth for synthetic stucco. 3 spray followed by smoothing the surface. 4 Application rubbed solution. 5 Finishing solution, tanning Pod and usenkov. 6 Smooth surface with grout.
Before plaster concrete surfaces, install rails Beacons. The thickness of the rails - not more than twenty tork mm. At a distance of 2 m prymorozhuyut solution of gypsum. After applying the second layer of plaster, conduct the alignment between beacons. Thickness of plaster solution should not act on lighthouses. After drying, put a second layer of mortar. The third layer is applied tork as long as the surface is not aligned to the level of lighthouses. And only then begin to plastering angles and slopes.
The final stage - drawing Covering layer of plaster. Its thickness should be no more than two millimeters. When wet plaster tork grout float spend the last layer of felt soles. Synthetic coating leveling metal grater. tork Indoor surfacing spend lime-cement mortar or Polymer materials used. Use quick-solutions are unacceptable.
More Articles: Insulation of walls balcony (0) Sliding doors partitions (0) Painting walls in the apartment with his hands (0) How to align walls in the apartment (0) How to choose plastic windows? (0) How to insulate walls in the apartment (0) How to wash whitewash the walls (0) You can post a comment.
Tags furniture a fairly comprehensive repair coverage required tork room room floor house used to make the necessary repair floor repair ceiling repair the walls of the interior only wallpaper Categories Tools and Equipment Tools Materials Interior Construction History tork repairs Bathroom Ventilation Drywall types of brick apartment door design tork interior design 'EMU Shower Electricity Country House Apartment Complex Furniture & Interior Renovation Not quite Processing Processing floor ceiling Decorating Nursery tork Decorating kitchen walls facade lighting designer floor tiles Tips Field Hockey Repair Repair Floor Repair their own hands Repair Repair ceiling wall Bathroom Plumbing Bedroom Walls Wall
All rights reserved. 4bud.com.ua tork - All for repair of flats - Practical articles on repair and construction Using materials of the site the direct and obvious tork link to the site www.4bud.com.ua is required.
uk
can be performed in different ways. First - dry plaster. Wall letters are processed on dry plaster tork frame label or directly on the wall. The second method tork - wet plaster. On the wall is applied to the solution and held facing tile materials.
Fixing a flat, on a concrete surface make hand or machine, strokes notch. Strokes applied every 50 cm to a depth of 3 to 5 mm. If the surface is smooth, then there is no need to put a notch. Such walls are not plastered and leveled with a spatula. Also includes preparation of the concrete surface cleansing of dirt, dust, oily stains, concrete frame sag and stains.
If the walls are too big swings surface, then use a metal grid alignment. tork It is fastened with great tension, tork Entangling wire. To a flat surface plaster mesh can prymorozyty special solution or shoot stroypistoletom. Mesh plaster should not sag. After its attachment to apply cement milk.
1 Check the vertical walls. 2 Wetting water surface if applied to wet plaster. And - wipe with a damp cloth for synthetic stucco. 3 spray followed by smoothing the surface. 4 Application rubbed solution. 5 Finishing solution, tanning Pod and usenkov. 6 Smooth surface with grout.
Before plaster concrete surfaces, install rails Beacons. The thickness of the rails - not more than twenty tork mm. At a distance of 2 m prymorozhuyut solution of gypsum. After applying the second layer of plaster, conduct the alignment between beacons. Thickness of plaster solution should not act on lighthouses. After drying, put a second layer of mortar. The third layer is applied tork as long as the surface is not aligned to the level of lighthouses. And only then begin to plastering angles and slopes.
The final stage - drawing Covering layer of plaster. Its thickness should be no more than two millimeters. When wet plaster tork grout float spend the last layer of felt soles. Synthetic coating leveling metal grater. tork Indoor surfacing spend lime-cement mortar or Polymer materials used. Use quick-solutions are unacceptable.
More Articles: Insulation of walls balcony (0) Sliding doors partitions (0) Painting walls in the apartment with his hands (0) How to align walls in the apartment (0) How to choose plastic windows? (0) How to insulate walls in the apartment (0) How to wash whitewash the walls (0) You can post a comment.
Tags furniture a fairly comprehensive repair coverage required tork room room floor house used to make the necessary repair floor repair ceiling repair the walls of the interior only wallpaper Categories Tools and Equipment Tools Materials Interior Construction History tork repairs Bathroom Ventilation Drywall types of brick apartment door design tork interior design 'EMU Shower Electricity Country House Apartment Complex Furniture & Interior Renovation Not quite Processing Processing floor ceiling Decorating Nursery tork Decorating kitchen walls facade lighting designer floor tiles Tips Field Hockey Repair Repair Floor Repair their own hands Repair Repair ceiling wall Bathroom Plumbing Bedroom Walls Wall
All rights reserved. 4bud.com.ua tork - All for repair of flats - Practical articles on repair and construction Using materials of the site the direct and obvious tork link to the site www.4bud.com.ua is required.
uk
No comments:
Post a Comment