Sunday, February 22, 2015

After drying primer base freshly poured mortar mix. It is well spread out, forming a flat surface (


Flooring use plastic and ceramic tiles. They lie on a flat surface. Therefore, training should be carried out under the floor tiles, or within two to three weeks of operation any gap or bump will present to you an unpleasant "surprise".
If the base - wooden floor, drive all protruding nails, screws dovintite and drown. The gap between the boards can not leave, other than narrow (2-3 mm). In the wide gap driven rack of soft wood. It is advisable to strengthen them either with glue or nails obliquely with countersunk sanitaire heads. After the closing of cracks the surface, if necessary, prostrugivayut, potholes shpatljujut. Dried putty - walk sandpaper on a wooden block. Then the floor should be cleaned from litter and ogruntovat varnish.
To lay the tiles on the old wooden floor can be used only if walking boards do not bend. The same applies to the parquet. If parquet blocks (riveting) loosened, they should fix nails or paste on mastic. sanitaire
Concrete floors are under preparation. It is necessary to remove grease and oil stains: warm water to dilute it with caustic soda (100-150 g per 10 liters) or 2.3% solution of hydrochloric acid. Large cracks and potholes (deeper than 5 mm) moistened with water and sealed with cement mortar. Places with defects can be lubricated with white glue. to enhance adhesion. The surface of the plaster trowel smooth down flush with the floor surface. The solution was allowed to stand for 12 hours. The spraying several times with water. sanitaire After hardening solution is necessary to grind the entire surface of the coarse bar and cleaned from dust.
Original materials offer domestic and foreign manufacturers. Home handyman should pay attention to the dry mortar mix for self-leveling screed: with the help of well-aligned base floor under different cover - linoleum (floor preparation under the linoleum), parquet (floor preparation under the floorboard) tile (floor preparation for tiling). To work does not need to be a professional builder. Preparation of the surface under the tile. On the border of the floor - wall lay special separation of polystyrene foam tape. Cracks and sinks should be sealed adhesive. Then the base of the ground, and fragile and porous substrates sanitaire - even 2-3.
After drying primer base freshly poured mortar mix. It is well spread out, forming a flat surface (self-leveling). Sometimes sanitaire use a metal trowel, notched trowel for the distribution of the mixture. The layer thickness is 2-10mm. It is not excluded the formation of air bubbles: they are easy to remove, pass a spiked roller along and across the entire tie. Roller also facilitates docking portion of the solution. Special shoes to walk on pins allows a fresh solution.
2011 (37) September (12) Where to start repair the apartment? Installation of gypsum partition boards for interior burn ... Installation of metal frame for plasterboard drywall Repair Drywall How to cut a sheet of drywall? Features drywall putty filler sanitaire for plasterboard Preparing the floor under the tile How to lay tile on the floor? How to put laminate flooring? Plastering October (13) November (6) December (6) 2012 (51) January (11) February (8) March (5) April (3) May (5) June ( 4) July (5) August (3) September (4) October (3)


No comments:

Post a Comment